Technical note MS-TN-01, November 2026
Estimators of the simulation layer
Definitions and proofs
Markland Street
Abstract
The simulator reports a minimum of seven figures for every option of a decision: an expected cost, its standard error, a gain against the baseline, a tail expectation, a regret, a probability of being best, and a coverage rate for its own past forecasts. This note defines each figure and proves the properties that make it safe to act on. The estimators converge at a known rate. Options compared on the same paths are compared with less noise. The tail measure is coherent. Regret ranks options exactly as expected cost does. Waiting for information never has negative value. Calibration can be tested out of sample. The models that generate the paths are outside the scope of this note and are available under NDA
| Figure | Symbol | Defined in | Properties |
|---|---|---|---|
| Expected cost | Definition 2 | Proposition 1 | |
| Standard error | Definition 2 | Proposition 1 | |
| Gain against the baseline | Definition 3 | Propositions 2 and 3 | |
| Expected shortfall | Definition 4 | Propositions 4 and 5 | |
| Regret | Definition 5 | Proposition 6 | |
| Probability of being best | Definition 5 | Proposition 6 | |
| Coverage | Definition 6 | Propositions 8 and 9 |
1 Setup and notation
A decision has options , one of which, written , is the baseline. The unknowns of the decision form a random vector with law on a probability space . Each option has an outcome , a real random variable. Outcomes are written as costs, so lower is better, and a gain is a cost avoided. We assume throughout
Definition 1 (Paths) A run draws independently from and sets for every option . The -th path is the vector . All options are evaluated on the same draw
We write , and . The path-wise optimum is , the cost of whichever option turns out best on that path
2 The Monte Carlo estimator
Definition 2 (Mean and standard error) The expected cost of option is estimated by the mean over paths, and its precision by the standard error
Proposition 1 (Unbiasedness and rate) (a) and . (b) almost surely as . (c) converges in distribution to , and
Proof The are independent copies of . Linearity of expectation gives the mean, and independence gives , hence (a). Part (b) is the strong law of large numbers and the first half of (c) is the central limit theorem. Both need only the finite second moment assumed in Section 1. For the last claim, expand
and take expectations: the right side has mean
Remark The error falls as whatever the dimension of , which is why the method extends to decisions with many unknowns. Since , part (c) makes an asymptotic 95% interval for . A tolerance at that level needs paths
The preview ends here. The full note continues with
- 3 Comparison on common paths
- 4 Quantiles and expected shortfall
- 5 Regret and the probability of being best
- 6 The value of waiting
- 7 Calibration out of sample
- 8 Reproducibility
- References