Enterprise AI for physical operations

For companies that make, move and maintain physical things, from $100M to $2B. Two full samples and four step-by-step scenarios below

Markham Aviation: A sample airline, end to end

A regional airline on synthetic data: 18 aircraft, 763 flights a week, 8 source systems and 4,894 live objects

Network, week of 20 OctoberSample data · Fri 07:10 Halifax
Route, width by weekly flightsAircraft on the ground nowAircraft on the ground (AOG)
The agent's plan for the grounded aircraft 407, with each step and the change waiting for approval
  • A grounded aircraftEvery option costed in under half a second, and an approved plan 24 minutes after the first fault message
  • A deferral about to expireCA$7,532 for a loan unit, against CA$510,870 to ground the aircraft
  • How we built it8 systems, 22 object types, 45 links and 74 checks: the scope of a go-live in under six weeks
A part that may arrive latePriced by the simulator on the sample airline

Sample data. The airline is fictional and has no link to Markham, Ontario or its airport

Every industry we build for

Construction

Projects, schedules, RFIs, crews, equipment and contracts in one model

A steel-framed building under construction, with a mobile crane lifting a rooftop unit
Sample data

Ashgrove Constructors: a general contractor with four projects and a company equipment yard

  1. SignalThe morning digest flags RFI-0073: the rooftop air handling units on order are not the model on the latest mechanical drawing
  2. Model updatesA field event links the RFI to activity A1560, now 12 working days past its float, and to milestone MS-MEP, which carries $12,500 a day in liquidated damages
  3. AgentThe assessment finds three earlier signals, confirms the order used an older drawing set and finds a close match in the company yard. It asks the superintendent four questions
  4. Waiting for approvalTwo scenarios: take the yard unit and hold the milestone for $163K, or wait for the architect’s variance with up to $1.3M of exposure. Email substitution request Email owner notice Inbox mechanical trade brief Yard hold the unit
  5. ApprovalThe superintendent chooses the yard unit and approves each step
  6. LoggedEach letter is filed in the correspondence log with who it went to, by which channel and when
  7. ResultThe owner notice goes out a day before the contract’s notice deadline

Sample data on the platform service: 8 source systems, 11 pipelines with 118 checks, 51 object types, 29 actions and 73 functions. The company, its projects and people are fictional

A crew that may not be therePriced by the simulator, set up during the build
The command centre for Lakeshore Health, West Tower: six headline tiles, the risks and opportunities picked for the superintendent, field events and the schedule

Food and beverage

Farms, silos, batches, cold chain and shops in one model

A milk tanker drawing milk from the bulk tank in a farm milk house
Illustrative scenario

A Maritime ice cream maker: one plant, six shops, milk from local farms

  1. SignalThe lab system posts QA test T-5512 for batch B-2304: butterfat 12.6%, under the 13.5% specification
  2. Model updatesA QaTest object links to Batch B-2304. Its derived qaStatus becomes Fail. Link traversal through Batch → Shop finds 22 cases at three shops
  3. AgentQuality watch recommends Place QA hold, pulling the product from sale at the three shops and replacing it from B-2299, which passed
  4. Waiting for approvalERP block B-2304 POS pull the item at 3 shops ERP transfer from B-2299 Email shop leads
  5. ApprovalM. Novak, QA lead, approves
  6. LoggedAction log entry 8840, with the test result attached
  7. ResultThe product is off sale nine minutes after the result

Modelled, not a customer result: off sale in 9 minutes against the next morning; 22 cases contained

A supplier that may miss its date againPriced by the simulator, set up during the build

Manufacturing

For aerospace and defence suppliers on ERP, MES and spreadsheets

A five-axis machining centre beside a measuring machine and a rack of machined brackets
Illustrative scenario

A three-plant aerospace supplier with export-controlled parts

  1. SignalThe plant floor feed shows spindle vibration on mill 4 up 18% over seven days
  2. Model updatesMachine M-4 updates. The derived remainingUsefulLifeDays falls to 9. Linked WorkOrder WO-318, an ITAR part, is booked on M-4 next week
  3. AgentMachine health recommends replacing the bearing in Saturday’s planned downtime and moving WO-318 to mill 6
  4. Waiting for approvalMaintenance work order PM-2290 with bearing kit MES move WO-318 to mill 6 ERP reserve the kit Email maintenance lead
  5. ApprovalThe plant manager approves. Drawings stay visible only to staff cleared for the ITAR access label
  6. LoggedAction log entry 5120
  7. ResultThe bearing is replaced in planned downtime

Modelled, not a customer result: 31 hours of unplanned downtime avoided

A machine that may not last the weekPriced by the simulator, set up during the build

Logistics

Shipments, trucks, reefers, docks and customers in one model

A gantry crane over stacked containers, with a refrigerated container leaving on a truck
Illustrative scenario

A Maritime cold-chain carrier running loads out of Halifax harbour

  1. SignalA road closure near the junction moves the ETA of truck TR-14 2 hours 40 minutes past its 16:00 dock appointment in Saint John
  2. Model updatesShipment SH-7781 updates its ETA. The derived detentionRisk becomes High. Its linked DockAppointment and customer order are flagged
  3. AgentDispatch watch recommends cross-docking the load to TR-21, already at the north depot, and drafts the customer update
  4. Waiting for approvalTMS reassign SH-7781 to TR-21 Ontology rebook the dock for 16:30 Email customer update
  5. ApprovalThe dispatcher edits one line of the update and approves
  6. LoggedAction log entry 2264
  7. ResultThe load is delivered at 16:25

Modelled, not a customer result: 4 hours of detention and $600 in fees avoided

A load that may miss its windowPriced by the simulator, set up during the build

Utilities

Feeders, meters, crews and customers in one model

Wooden utility poles with a transformer and a recloser, and a bucket truck at the middle pole
Illustrative scenario

A rural electric co-op during an overnight storm

  1. Signal214 smart meters on feeder 12 send last-gasp messages
  2. Model updatesAn Outage object is created and linked to Feeder 12, 1,840 Customer accounts and the nearest Crew objects
  3. AgentOutage watch recommends crew 4 (18 minutes away, carrying three cutouts) over crew 2 (41 minutes) and drafts an estimated restoration time of 05:30
  4. Waiting for approvalMaintenance dispatch crew 4 on WO-7781 Ontology publish the outage SMS restoration estimate to 1,840 customers
  5. ApprovalThe system operator approves
  6. LoggedAction log entry 0412
  7. ResultPower is restored at 04:55

Modelled, not a customer result: customers told 40 minutes sooner

A job that may run overPriced by the simulator, set up during the build

See it on a model of your operation

An architect's scale model of a small operation on a work table under a desk lamp