Enterprise AI for physical operations
For companies that make, move and maintain physical things, from $100M to $2B. Two full samples and four step-by-step scenarios below
Markham Aviation: A sample airline, end to end
A regional airline on synthetic data: 18 aircraft, 763 flights a week, 8 source systems and 4,894 live objects
- A grounded aircraftEvery option costed in under half a second, and an approved plan 24 minutes after the first fault message
- A deferral about to expireCA$7,532 for a loan unit, against CA$510,870 to ground the aircraft
- How we built it8 systems, 22 object types, 45 links and 74 checks: the scope of a go-live in under six weeks
Sample data. The airline is fictional and has no link to Markham, Ontario or its airport
Every industry we build for

Food and beverage
Stock, cold chain and demand across every site
BatchSiloReeferShopSee the scenario
Manufacturing and industrials
Late parts traced to the orders they affect
MachinePartWork orderOrderSee the scenario
Logistics
Every load and exception on one map
LoadTruckRouteCustomerSee the scenario
Utilities
Outages, crews and customer updates together
AssetOutageCrewCustomerSee the scenario
Aerospace and aviation
A grounded aircraft back in service sooner
AircraftDefectPartFlightSee the full example
Construction
Every job site at a glance, and a fix for the critical path
ProjectRFIActivityEquipmentSee the full exampleSomething else
Automotive, energy and retail, scoped with you
YourownmodelTell us about yours
Construction
Projects, schedules, RFIs, crews, equipment and contracts in one model

Ashgrove Constructors: a general contractor with four projects and a company equipment yard
- SignalThe morning digest flags RFI-0073: the rooftop air handling units on order are not the model on the latest mechanical drawing
- Model updatesA field event links the RFI to activity A1560, now 12 working days past its float, and to milestone MS-MEP, which carries $12,500 a day in liquidated damages
- AgentThe assessment finds three earlier signals, confirms the order used an older drawing set and finds a close match in the company yard. It asks the superintendent four questions
- Waiting for approvalTwo scenarios: take the yard unit and hold the milestone for $163K, or wait for the architect’s variance with up to $1.3M of exposure. Email substitution request Email owner notice Inbox mechanical trade brief Yard hold the unit
- ApprovalThe superintendent chooses the yard unit and approves each step
- LoggedEach letter is filed in the correspondence log with who it went to, by which channel and when
- ResultThe owner notice goes out a day before the contract’s notice deadline
Sample data on the platform service: 8 source systems, 11 pipelines with 118 checks, 51 object types, 29 actions and 73 functions. The company, its projects and people are fictional
A crew that may not be therePriced by the simulator, set up during the build
Food and beverage
Farms, silos, batches, cold chain and shops in one model

A Maritime ice cream maker: one plant, six shops, milk from local farms
- SignalThe lab system posts QA test T-5512 for batch B-2304: butterfat 12.6%, under the 13.5% specification
- Model updatesA
QaTestobject links toBatchB-2304. Its derivedqaStatusbecomes Fail. Link traversal throughBatch → Shopfinds 22 cases at three shops - AgentQuality watch recommends
Place QA hold, pulling the product from sale at the three shops and replacing it from B-2299, which passed - Waiting for approvalERP block B-2304 POS pull the item at 3 shops ERP transfer from B-2299 Email shop leads
- ApprovalM. Novak, QA lead, approves
- LoggedAction log entry 8840, with the test result attached
- ResultThe product is off sale nine minutes after the result
Modelled, not a customer result: off sale in 9 minutes against the next morning; 22 cases contained
A supplier that may miss its date againPriced by the simulator, set up during the buildManufacturing
For aerospace and defence suppliers on ERP, MES and spreadsheets

A three-plant aerospace supplier with export-controlled parts
- SignalThe plant floor feed shows spindle vibration on mill 4 up 18% over seven days
- Model updates
MachineM-4 updates. The derivedremainingUsefulLifeDaysfalls to 9. LinkedWorkOrderWO-318, an ITAR part, is booked on M-4 next week - AgentMachine health recommends replacing the bearing in Saturday’s planned downtime and moving WO-318 to mill 6
- Waiting for approvalMaintenance work order PM-2290 with bearing kit MES move WO-318 to mill 6 ERP reserve the kit Email maintenance lead
- ApprovalThe plant manager approves. Drawings stay visible only to staff cleared for the ITAR access label
- LoggedAction log entry 5120
- ResultThe bearing is replaced in planned downtime
Modelled, not a customer result: 31 hours of unplanned downtime avoided
A machine that may not last the weekPriced by the simulator, set up during the buildLogistics
Shipments, trucks, reefers, docks and customers in one model

A Maritime cold-chain carrier running loads out of Halifax harbour
- SignalA road closure near the junction moves the ETA of truck TR-14 2 hours 40 minutes past its 16:00 dock appointment in Saint John
- Model updates
ShipmentSH-7781 updates its ETA. The deriveddetentionRiskbecomes High. Its linkedDockAppointmentand customer order are flagged - AgentDispatch watch recommends cross-docking the load to TR-21, already at the north depot, and drafts the customer update
- Waiting for approvalTMS reassign SH-7781 to TR-21 Ontology rebook the dock for 16:30 Email customer update
- ApprovalThe dispatcher edits one line of the update and approves
- LoggedAction log entry 2264
- ResultThe load is delivered at 16:25
Modelled, not a customer result: 4 hours of detention and $600 in fees avoided
A load that may miss its windowPriced by the simulator, set up during the buildUtilities
Feeders, meters, crews and customers in one model

A rural electric co-op during an overnight storm
- Signal214 smart meters on feeder 12 send last-gasp messages
- Model updatesAn
Outageobject is created and linked toFeeder12, 1,840Customeraccounts and the nearestCrewobjects - AgentOutage watch recommends crew 4 (18 minutes away, carrying three cutouts) over crew 2 (41 minutes) and drafts an estimated restoration time of 05:30
- Waiting for approvalMaintenance dispatch crew 4 on WO-7781 Ontology publish the outage SMS restoration estimate to 1,840 customers
- ApprovalThe system operator approves
- LoggedAction log entry 0412
- ResultPower is restored at 04:55
Modelled, not a customer result: customers told 40 minutes sooner
A job that may run overPriced by the simulator, set up during the buildSee it on a model of your operation